Home › Water and Wastewater Treatment Plant and System Operators: jobs in Colorado › Fcgov

Water Operator (Water Distribution)

Fcgov · Fort Collins, Colorado · Posted November 23, 2026 (3 days ago)

Listed in: Fort Collins, CO · Fort Collins–Loveland area

More jobs nearby: All jobs in Fort Collins, CO

Apply on Fcgov’s siteFill the application with AutoFillSee your fit for this role

Job description

Job

About the role

Work related to the construction, maintenance, inspection and/or repair of infrastructure including equipment operation and/or maintenance in the field for equipment specific to water distribution, wastewater collection, and storm drainage operations. The starting

Compensation

for this position is listed below, commensurate with experience: Associate Operator Levels I 2 - $32.15- $34.96 hourly Intermediate Operator Levels 3 4 - $37.05- $39.28 hourly Senior Operator Levels 5 6 -$41.64- $44.85 hourly

Responsibilities

  • and Responsibilities The following duties and responsibilities are illustrative of the primary functions of this position and are not intended to be all inclusive
  • Installs, maintains and repairs or replaces water, wastewater and stormwater facilities, assets and lines
  • Operates and maintains equipment and vehicles such as heavy equipment, dump trucks, front end loaders, backhoes and various hand tools
  • Maintains records such as daily reports, material control documents, service requests and map revisions
  • Acknowledges and follows City safety practices and policies
  • Provides customer service by answering questions, providing information and referrals and resolving complaints and problems
  • Tracks inventory
  • May oversee and direct the work of seasonal or fluctuating hourly employees
  • May inspect and survey utility infrastructure to determine condition and recommend improvements
  • Performs emergency locates as needed
  • Works on-call, call out and snow removal operations as needed

Posting 8703 on csod. Source: the employer’s listing. Valid through January 7, 2027 unless closed earlier.