Home › Heavy and Tractor-Trailer Truck Drivers: jobs in Texas › DELTA360
CDL Fuel Truck Driver – Data Center Construction Project
DELTA360 · TX · Posted November 20, 2026 (3 days ago)
- TX
Job description
Description
Please Read Before Applying
All Delta360 driver applicants must complete the official driver application through Tenstreet. Applications submitted outside of Tenstreet may not be reviewed.
Apply Here: https://intelliapp.driverapponline.com/c/deltafuel
Location: Hubbard, TX Schedule: 12-hour shifts, 6–7 days per week Type: Full-time, long-term project Compensation: Discussed during interview, plus per diem and housing provided
We’re looking for highly motivated CDL drivers to support a long-term data center construction project in Hubbard, TX. You’ll keep the jobsite running by fueling construction equipment using bobtail fuel trucks and stationary fueling stations. This is a fast-paced, high-responsibility role for drivers who take pride in safe, reliable work and are ready to commit to a demanding schedule.
Responsibilities Operate bobtail fuel trucks to fuel construction equipment across the jobsite Fuel equipment at stationary fueling stations as needed Follow all DOT, HazMat, and site safety procedures, including spill prevention and PPE use Track and report fuel inventory daily with accurate records Communicate clearly and professionally with customers and site personnel to keep equipment fueled and on schedule Perform and document pre- and post-trip inspections Report any equipment issues, safety concerns, or discrepancies right away
Required qualifications
- Valid Class A or Class B CDL with HazMat and Tanker endorsements (required)
- Current DOT medical card
- Clean driving record
- Safety-minded, with a strong commitment to following procedures
- Ability to work 12-hour shifts, 6 and sometimes 7 days per week
- Strong attention to detail, especially with inventory and record-keeping
- Excellent communication and customer service skills
- Reliable, self-motivated, and able to work independently or as part of a team
- Ability to pass a background check and DOT drug screen
- Fuel delivery or construction site experience preferred
Benefits
- Housing provided
- Per diem
- Overtime pay
- Medical, dental, and vision insurance
- 401(k)
- Long-term, steady work
Posting 4681431 on paylocity. Source: the employer’s listing. Valid through January 4, 2027 unless closed earlier.